Choosing a decommissioning company: five questions, before price
Choosing a data center decommissioning company comes down to five questions, asked before the price. What each one reveals, and how to judge the answers.
The work is invisible once finished: an empty hall looks the same whoever emptied it. What differs is what you can prove afterwards, so the way to choose is to ask about the record rather than about the labour.
1. Who actually performs each stage?
Inventory, removal, transport, destruction, recycling. Much of this industry subcontracts, which is fine when it is disclosed and a problem when it is discovered. Each handover is a point in the chain of custody, and you are entitled to know how many there are.
2. Can I see a blank certificate pack?
Before pricing, once the evidence standard on your decommissioning checklist is agreed internally. It shows whether records are per serial number or per pallet, whether the method per device is stated, and whether there is a reconciliation against your register: the pack described in what an ITAD certificate pack contains. A vendor who has to construct one for you has never been asked.
3. Which certifications, by number and expiry?
Not logos on a website. Numbers, the certifying body, and the expiry date, verifiable independently. And a second question that follows from it: is the certified facility the one my assets will actually go to?
4. How is the chain of custody maintained between my floor and the process?
Numbered seals, a manifest per container, a reconciliation on arrival, and what happens when the count does not match. That last part is the interesting one: the answer “that does not happen” means it has never been detected.
5. What is excluded?
Floor tile handling, cable removal above the ceiling, structural items, hazardous materials, out-of-hours access, elevator or dock booking fees, storage if the schedule slips. This question finds the difference between two quotes more reliably than any other. What makes up a quote is on the cost page, and the six factors that move it most are in what a decommissioning quote is made of.
The two answers that should end a conversation
“We can start next week without a site visit.” Floor access, dock access, elevator capacity and route are physical constraints that decide the schedule. Nobody can commit to them from a phone call.
“We will handle the paperwork at the end.” The paperwork is produced continuously, at each stage, or it is reconstructed at the end, which is not the same document and is worth much less.
What resale value does to incentives, said plainly
A vendor who keeps the resale proceeds has an incentive to classify assets as resellable, and a vendor paid per device destroyed has the opposite one. Neither is dishonest; both are structural. Knowing which model you are buying under is part of reading the quote, and it is covered on the resale article.
Put these five questions in the scope
They all have short factual answers. The call back writes them into your scope, so the provider who quotes has to answer them before the price.